If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
Metal roof rake detail.
Gable rake trim installation subscribe to our page for more metal roofing videos.
Designer series fluted.
Terms are used to break down the various areas of a roof and a rake is one of many roof sections.
Concealed fastening wall systems.
Rake trim pbu residential rake part dim a roof slope girth gauge weight each fl 1002 3 3.
A roof rake may be intricately designed.
Next take off the rake or gable trim take the cleat out and install it.
Sign up now to get the latest metal roofing and metal architectural product news 6 times a year.
Place corner pieces where panels will meet bends at the edge of the roofing.
Rake to metal wall detail.
Learn more about the main things to consider when choosing a metal roof with regard to roof slope including building codes and minimum slope requirements.
Deck w iso details.
The rake can be flat with no overhang or it can overhang the gable end like an eave.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
Let it stick out again just a little bit past and make a mark.
The rake is not exactly on the roof.
The overhanging rake then is closed in with soffit and fascia or left open.
We respect your privacy and will not use your.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
It is a term that describes the sloped sides of a gable end.
Put it against the roof and let it stick out by about an inch.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
Make a mark at the crease line and do the same thing towards the peak of the roof.
Here at 1st coast metal roofing supply we value our customer service and p.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.